ETI training...

  Condition For issuing tender&LOI 

  • Financial approval from MD are compulsory condition for issuing LOI 

  • Financial approval from MD is not necessary to open tender


Different Committee and Financial Power

  • TWC-MD,Director(Operation,W&P,SLDC,C&P,Finance),Chief(Planning,Energy system,PPMM)

  • BOD-Director(Operation,W&P,Finanace,

  • Appraisal

  • ETF

  • MDSPC

  • CSPC


No of Disc required in Transmission Line

 


Operating Voltage

Suspension

Tension

11Kv

1

1

33Kv

2

3

66Kv

5

6

132Kv

9

10

220Kv

14

15

400Kv

21

22


765 Kv Line contain two signal frequency

  • Power Frequency 50Hz

  • Carrier Frequency (3-148KHz)

Electricity status in U.P

  • Peak demand 23000MW

  • Total transmission Line Length 14000Km

  • Total no of substation 585


Power Transfer Capability



Distance B/w two substation

Voltage Rating

50Km

100Km

200Km

300Km

66Kv

22MW

11Mw

5.5Mw

3.6Mw

132Kv

120Mw

60Mw

30Mw

20Mw

220Kv

400Mw

200Mw

100Mw

67Mw

400Kv

1500Mw

750Mw

375Mw

250Mw


Record of Uttar pradesh in Power sector

  • First 210Mw & 500Mw power generator had been installed

  • 765&400Kv Line had been constructed (Anpara to unnav 403 km line 765 kv rating) 


Operating Voltage

Name of ACSR

Current Capacity at 750C

Size


Al No/mm        Steel No/mm

Weight

Kg/m

Resistance

ohm/km

Al Area

Sq mm

33/66kv

Dog

300Amp

6/4.72

7/1.57

1.42



66/132Kv

Panther

400-500A

30/3

7/3

2.1

0.139

200

220Kv

Zebra

735A

54/3.15

7/3.15

2.86



220/400Kv

Moose

800A-900A

54/3.53

7/3.53

3.18

0.056

520

765Kv









 As per International Standard IEC60300


Voltage Rating

Distance B/w Bay

Clearance

33Kv

6m

5.2m

132 Kv

12m

6.1m

220Kv

18m

6.9m

400Kv

24m

8.84m

 

Note:-As per this clause, of IE 1956, minimum ground clearance of 33KV uninsulated electrical conductor.This clearance is increased by 0.3 meter for every 33KV above 33KV.

Exp: 

 the minimum ground clearance of 400KV transmission line would be,

400KV – 33KV = 367KV and 367KV/33KV ≈ 11

Now, 11 × 0.3 = 3.33 meter.

So, as per logic, the ground clearance of 400KV bottom conductor would be, 5.2 + 3.33 = 8.53 ≈ 8.84 meter(considering other factors).


As per International Standard IEC60300   Indian electricity rule


Voltage Rating

Distance B/w Bay

Clearance

(Ground)

Line-line

Crossover

Line

Phase phase

Ground wire-

conductor

line&tree

Ground clearance for railway


11kv






2.6m


33Kv

6m

5.2m




2.8m


66kv






3.4m

14.10m

110kv






3.7m

14.10m

132 Kv

12m

6.1m

3.05m

3.9m

6.1m

4m

14.10m

220Kv

18m

6.9m

4.58m

5.1m

8.5m

4.6m

15.10m

400Kv

24m

8.84m

5.49m

7m

9m

5.5m

17.10m

765kv


12.15m/19m

7.94m

15m

12.4m



Earth wire 7/3.25mm&7/3.67mm 

Earth wire in EHV transmission lines is used to provide safeguard against lightening other transient surges and efficient operation of protection system under fault conditions. It serves the dual purpose of protecting the power conductors from lightening strokes and of conducting fault currents away to ground. apart from problems of lightening protection and power loss considerations, the earth wires must be of the suitable magnitude to withstand maximum possible ground fault currents. After accurate determination of currents in earth wire in the event of faults in the line and the resultant temperature rise the following optimum economic sized of earth wires are being used in various EHV transmission lines of UPSEB-

·   Ã˜  132 KV Transmission Lines...................7/3.25mm GS Earth wire (95kg/mm2 Quality)

ؠØ220 KV Transmission Lines...................7/3.67mm GS Earth wire (95kg/mm2 Quality)

Ø  Ã˜220 KV River Crossings...............7/3.67mm GS Earth wire (110kg/mm2 Quality)

Ø  Ã˜400 KV Transmission Lines...................2x7/3.67mm GS Earth wire (95kg/mm2 Quality)


The finished earth wire has minimum brittleness as it is subjected to continuous aeolin vibrations while in use on lines throughout its life. The steel wires (Strands) used in the manufacture of earth wire are hard drawn from high carbon steel wire rods. the electrolytic high grade zinc of minimum 99.95% purity conforming to IS:209 is used for the coating of steel wires. The steel wires are hot dip galvanized as per IS:2629.

Technical Particulars

Sl. No.

Technical Particulars

GS Earth Wire Size

7/3.67mm

7/3.25mm

110kg/mm2

95kg/mm2

95kg/mm2

1.

Indian standard to which earth wire conforms

IS:2141

IS:2141

IS:2141

2.

Area of cross-section (sq. mm)

74

74

58

3.

Nominal overall diameter (mm)

11

11

9.75

4.

Lay length (mm)

(a) standard

181

181

160

(b) Maximum

198

198

175

(c) Minimum

165

165

145

5.

Mean Lay ratio of outer layer

16.45

16.45

16.41

6.

Calculated %age Increase in length of outer layer

2

2

2

7.

Maximum working Tension (kg)

8140

7030

5510

8.

Guaranteed UTS

8140

7030

5510

9.

Approx weight in Earth wire (kg/km)

(a) STEEL

559

559

440

(b) ZINC

23.5

23.5

20

10.

Weight of Earth wire (kg/km)

582.5

582.5

460

11.

Co-efficient of linear expansion per C

11.5x10-6

11.5x10-6

11.5x10-6

12.

Max. DC Resistance at 200 C of Earth wire (Ohm/km)

2.79

2.79

3.55

13.

Standard length without joint (m)

2600

2600

2600

14.

Tolerances in

(a) Standard diameter of galvanized steel strand (mm)

+ 0.073

+ 0.073

+ 0.065

(b) Standard length (m)

+ 130

+ 130

+ 130

·  

·      Circuit Breaker Working Principal

  • Pneumatic Mechanism

  • Gang operator mechanism

Ground Mat: It is placed above a ground grid or eart’s surface.It is used for minimising the danger of the exposure to high step or touch voltage.

Ground potential Rise: 

CEA(Central transmission Utility)-PGCIL is responsible to provide licensee.

  • Empowered committee chaired by member of CEA

  • Transmission Project is monitored by CEA & Ministry of power monitors the process of the execution of project as per condition of licensee issued.

  • Decide surge Impedance loading,contingency, Load Requirement


SLDC Department

  • SCADA & IT unit

  • Energy Accountant

  • Reliability and Auxiliary

  • System Operation

  • Open Access scheduling 

TTC=Total transmission capabilities 

ATC=Available Transfer capability

ABT=Availability Based  Tariff

LGBR=Load generation Balance Report

DTPC=Digital Tele Protection Coupler

SDH=Synchronous Digital hierarchy

PDH=plesiochronous Digital Hierarchy

BPMS=Bill process monitor software

D.P.C=Departmental promotion committee

L.P.C=Last Payment certificate

I.F.S.C=Indian financial system code

RAPDRP=Restructured Accelerated power Development and reforms program

M.R.I=Meter Reading instrument

TPMO=Triple pole manually operated

ERC=Electricity regulatory commission

AT&C loss=aggregate technical & Commercial losses

GTP=Guaranteed Technical particular

PFC=power finance corporation

NEFT=National Electronic Fund transfer

PPA=Power Purchase Agreement

PSA=Power Supply Agreement

SPAT=Special Power Agreement tariff

FS& PS type foundation-fully submerged&Partial submerged

AMI=Advanced Metering Infrastructure  Download

AMR=Automated Meter Reading Device  Download

SFI -Significant Financial Interest

MRI=Meter Reading Instrument  Download

RAPDRP-Restructured Accelerated Power Development and Reforms Programme

ASCII-American Standard Code for Information Interchange

CVT-capacitor voltage transformer

DRAM-Dynamic Random Access Memory

WMCR

LC-Letter of credit

SIDBI-Small Industries Development Bank of India

IMF-International Monetary Fund

GUI-Geographical User Interface

CDAC-Centre for Development of Advanced Computing

MDA-Market Development Assistance

FORTRAN-Formula Translation,

KIPS. Kilo Pounds (measure of force)

EEPROM - Electrically Erasable Programmable Read-Only Memory

HTML- hypertext markup language

LBB-Local Breaker Back-up Protection 

LVS-Low Voltage Switch gear


CAL-Computer Assisted Learning

PPM-Parts Per Million

DMP-Dynamic multi-pathing

PPM-Parts per million

DWP-Department of Work and Pensions

BSIC-base station identity code 

POST-Power On Self Test

ENIAC-Electronic Numerical Integrator And Computer

PROM-Programmable read-only memory 

GIS-Geographic information system

 RCC - Reinforced Cement Concrete

CERC-Central Electricity Regulatory Commission 

APTEL-Appellate Tribunal for Electricity

NEF-Nikon Electronic Format 

IPDS-Integrated Power Development Scheme

UDAY-Ujwal DISCOM Assurance Yojana

PDA- Personal Digital Assistant

COBOL-Common Business-Oriented Language

LTC-Leave Travel Concession

ATR-Average Tariff Rate

DOE-Department of Energy

ABR-Average Billing Rate

ABC-Aerial bundled cables 

XLPE Cable- Cross-linked polyethylene cable

TDS-Tax Deducted at Source

STS-Static Transfer Systems/Standard Transfer Specification

CTS-Currency Transfer Specification


IDAM/IAM-Identity and Access Management

PIM-Privileged Identity Management 

PAM-Privileged Access Management

IGRS- Integrated Grievance Redressal System

OECD- Organisation for Economic Co-operation and Development 

OECF-

JBIC-Japan Bank for International co-operation

LILO-Line IN Line Output

ERP-Enterprise Resource Planning

VAT-Value Aided Tax

ECS-Electronic Clearing Service


OLTC-On-Load Tap Changer 

DETC- Deenergised Tap Changer

IMCS-Integrated Monitoring and Control System

MBC-Mill and Burner control

BPL-Broadband over power lines 

Fame-Faster Adoption and Manufacturing of Electric and Hybrid Vehicles

DTC-Direct Torque Control

ACSR-Aluminium conductor steel-reinforced 

AAAC-All Aluminium Alloy Conductor

MDAS-Metering and Data Acquisition Systems 

ERP-Energy Related product/Enterprise  Resource Planning

HVDS-High Voltage Distribution System

HND-Higher National Diploma

VLSI-Very Large Scale Integration

ISOC-Internet Society

RESPO-

SCADA-Supervisory Control and Data Acquisition

LD-Load Shedding

PD-Partial Discharge/Permanent Disconnection

MIS-

MRI-Magnetic resonance imaging 

PFC-Power Factor Correction

CFL-Compact Fluorescent Lamp

DISCOM-Distribution Company

CPF-Contributory Provident Fund

IDF - Identified Defective

RDF - Reading Defective

ADF - Appear Defective

CDF - Ceiling Defective

LOA-Letter Of Authorizationiont

SCADA-Supervisory Control and Data Acquisition

EL/CL-Earned Leave/Casual Leave

PERT. Project Evaluation and Review Technique 

ESA-Essential Service Allowance/Employment and Support Allowance 

SAIFI -System Average Interruption Frequency Index

CGRF-Consumer Grievances Redressal Forum

LPSC-Late Payment Surcharge

IDAM/IAM-Identity and access management

PRV-Pressure relief valve 

PSV-Pressure Safety Valve

LWP-Leave Without Pay

REC- Rural Electrification Corporation Limited

PFC-Power Finance Commission

CFL-Compact fluorescent lamp

CPF- Contributory Provident Fund

TTA-Technology Transfer Alliance

MDA-Management Discussion&Analysis

ISOC-Internet Society 

HES-Headend System

TIN-Tax Information Network

RTU-Remote Terminal unit

PLCC-Power Line Carrier Communication

UUE-Unauthorised use of electricity

ACS-average cost of supply 

ARR-average revenue realised 

PCC-Plain Cement Concrete

GST-Goods and Services Tax

PDP-Potential Draft Para

PCM-Pulse Code Modulation

FRP-Financial Responsibility Plan

UPERC-Uttar Pradesh ElectricityRegulatory Commission

ENIAC - Electronic Numerical Integrator and Calculator

UNIVAC - Universal Automatic Computer (First Digital Computer)
 EDVAC – Electronic discrete variable automatic computer
 EDSAC – Electronic delay storage automatic calculator



CRCA means cold rolled close annealed

HRCA means Hot Rolled close annealed



ACR=Annual Confidential Report

ACP=Assured Career Progression

Station Transformer configuration: delta-star

Power Transformer: star star

For Touch Voltage Zth=Rf/2=1.5rho where Rf=rho/4b where  rho=earth resistivity b=disc radius

For Step Voltage Zth=2R

Circuit Breaker Arrangement in substation

  • Double Bus Double Circuit Breaker

  • Double Bus and 1 half circuit breaker


Type of Breaker

Range

SF6

36kv-765Kv

VCB

36Kv

ACB

12Kv


Decision of Circuit Breaker Rating 

if V<345 kv   Rating is decided by lightning Arrester

  V>345kv      Rating is decided by System Voltage


Circuit Breaker Rating Calculation (Standard Voltage=V)


Circuit Breaker Rating Vcb=V+10V100           if V<345Kv

                                                V+5V100           if 345 V<750Kv

                                               V+10V100           if V>750Kv




Type of Relay

  • Electromechanical

  • Static

  • Digital

  • Numerical

Power consumption of Relay=50W     for medium &High voltage line

                                              =3kw      for EHV line





Land Requirement for Different Voltage Rating Substation



Voltage Rating

AIS Substation

GIS substation

Hybrid Substation

132

2 Acre

.75 Acre

1 Acre

220

10 Acre



400

40.45 Acre



 



Relay Used in Protection of Transformer

  • Differential Relay

  • Buchholz Relay

  • Earth Fault Relay

  • Over Flux Detection Relay

  • WT/OT Protection Relay


Line Reactor Rating For Different Voltage Rating


Voltage Rating

Reactor Rating

132 kv

80MVR/km

220Kv

80MVR/km

400Kv

160Mvr/Km

765Kv

250Mvr/Km


  • Shunt Reactor Placed Both end of line for avoiding overvoltage

  • Bus Rector -No need of NGR

  • Line reactor Required NGR


Fiber optic

  • Is used for Digital synchronize

  • Send Data to SLDC 


765 Kv substation contain double protection channel

  • PLC

  • Fibre optic required Repeater


Surge Arrester is a non linear metal it Helps to protect

  • Helps to protect from Lightning

  • Transient Voltage

  • Sparks,Load Shading,switching and fault

  • Limit the current and voltage surge to protect high and low voltage appliance as well as communication line


Surge Arrester Testing

  • Non linear blocks-sintered metal oxide material

  • Creepage Distance=25mm/Kv prevent from failure due to uneven voltage gradient

  • Arrester shall be fully stabilized thermally also consider solar Radiation etc

  • Suitable for hot line 

Test Required for Porcelain components

  • Temp cycle

  • Porosity

  • Visual Examination


CT Test

  • Turn Ratio

  • Polarity

  • Saturation

  • Insulation Resistance test

  • CT winding

  • Burden test


Example i) metering CT 0.3B0.6 last no 0.6 specify burden in

 ratio=500/5

 Burden of CT=520.6=15VA

 ii)Relaying CT 10C400 las no secondary voltage at 20 times of rated secondary current without exceeding 10% ratio.

R=400520=4

Burden of CT=524=100VA


Type of Busing

  • Portioline

  • Glass

  • Silicon


Substation Maintenance

  • Update SLD based on construction

  • Instruct SSO to  maintain Record Data Book (logsheet) properly

  • Battery Room & Relay Room should be neat&clean 

  • Attendance Register should filled daily

  • Analyse load variation at regular interval

  • Relay flag should be cleared within time


Equipment calculation formula at substation 132/33 Kv

Suppose

Total i/p line=n,o/p line=m containing 2 transfer bus and 1 main bus

Towards 132 Kv 

Total no of bus required to connect TBMi=m+n+1

Total no of bus required to connect TBMii=m+n+1

Total no of bus required to connect TBT=1

Total no of CT Rating 800-400-200/1-1-1 required=3(n+m+2)

Total no of CT Rating  400-200-100/1-1-1 required=3m

Center break iso=2(m+n+2)

Iso with earth switch=n

SF6 CIRCUIT breaker=m+n+2

Total no of PT=3(n+2)

Total no of Tandem iso=2(n+m)+1

Surge Arrester=3(m+n)


Towards 33Kv Line

No of o/p=m

No of i/p=n

VCB=m+n+1

CT rating 800-400/1-1-1=3n

CT Ratio 400-200/1-1=3(m+n+1)

Double Break iso=n+3m

Iso with switch=3m

Security deposit =min 1% of contract

Performance guarantee =10% of contract


Transformer incomer CT is used for

  • Differential Protection

  • Overcurrent & Earth Fault

  • Metering


Transformer Protection:

  • Overvoltage due to surge/lightning/switching

  • overload(Thermal overload relay-works based on current,thermal time constant&current

  • Oil filled transformer is equipped with thermostat controlling

Mechanism used in transformer:

  1. DGPT(below 10MVA

  • For detection of gas,pressure,leakage&Temp

  1. Buchholz Relay(Above 10MVA

  • Gas,oil leakage,pressure

  • Fuse is used towards high voltage side(primary side

  • Circuit breaker is used on both(primary&secondary side

Inrush Current:

  1. Magnetic inrush current can be 10 times for step up transformer

  2. Magnetic inrush current can be 25 times for step up transformer

Bus Coupler CT is used for

  • Distance Protection

  • Overcurrent & Earth Fault protection

  • Metering 

Relay:

  1. Induction Type:  AC only

  • For Distance and directional 

  • Fast & Accurate type Relay

  1. Attracted armature Electromagnetic Type Relay:used for AC/DC

  2. Polarised DC Relay:for greater sensitive Relay

# 3 Core CT is used for 400 KvSubstation

  • Primary protection

  • Backup protection

  • Measurement

# 5 Core CT is used for >400 KvSubstation

  • Bus Bar Protection

  • Main Bus-1 Protection

  • Main Bus-2 Protection

  • Measurement 

  • Local Bus protection


# Impedance Relay is used for line protection

#CVT is used for carrier trip protection


Insulator Testing

  • Power Frequency dry Flashover test

  • Power Frequency wet flashover test

  • Impulse frequency Flashover Test

  • Temp cycle Test

  • Puncture Voltage test

  • Mechanical strength test

  • Electro mechanical Test

  • Porosity test


Tower Type

  • ATM

  • ATMS

  • BTM

  • BTMS

  • ERT

  • CCM

 

Right of Way for Different Voltage Ratings Line


Voltage Rating

Width

132Kv

27m

220Kv

35m

400Kv

53m

765Kv

85m


Lightning Arrester Testing

  • Steep Current Test

  • Lightning Current Impulse

  • Long Duration current impulse 


For 400Kv Line

  • Type of tower

  • Ground clearance  8840 mm min

  • Sag at 850C below 150mm

  • Alignment will be kept at min distance 300m from power line



U.P power sector Background

U.p Power sector designed 132kv,220kv,400kv,765kv transmission line.No HVDC Line constructed by U.p Power sector till 9 jun2021 and capacity is mentioned in below table


Substation Rating

Total no

Capacity

765Kv

2

6000 MVA

400Kv

22

20820 MVA

220Kv

125

44920 MVA

132Kv

426

50410 MVA


 Citizen Centric Governance by Rajesh Mehtani Deputy secy uppcl 8795810620


9 Attributes of good governance(CEER PARTS) download  link1    link2


  • Consensus oriented

  • Equitable & Inclusive

  • Effective and efficient

  • Responsive Equitable and inclusive

  • Participation

  • Accountability

  • rule of law

  • Transparency

  • Strategic vision

 

Barriers In Good Governance: download link2

  • Attitudinal problem

  • Lack of Accountability

  • Red Tapism

  • Ineffective Implementation Of Rules & Regulation

  • Low Level Awareness of of Rights & Duties of Citizen

 

Initiative for Good governance in India:

  • Right To Information

  • Modern Technology Adoption as E-Governance

  • Transparency

  • Accountabilities

  • Focus on outcome by Evaluation &Monitoring

  • Rule of Law-Zero tolerance Policy

  • Making Institution Vibrant,Responsive & Accountable

  • Grievance Redressal Mechanism

  • Decentralization

  • Citizen Participation

  • Process Simplification

  • Competent and Dedicated workforce

  • Knowledge

  • Skill

  • Experience

  • Attitude

 

Core Principle for making governance towards Citizen Centric

  • Transparency

  • Policy Reform

  • Legal Reform

  • Ethics & Governance

  • Rule of Law-Zero tolerance Policy

  • Making Institution Vibrant,Responsive & Accountable

  • Citizen Participation

 

 

Important Instruction in Uppcl

  • Property Declaration  1jun-31Dec

  • Increment -Jan/July

  • Financial year- 1April-31March

  • SelectionYear  July-June

  • Uppcl Calendar Year 1Jan-31Dec

  • Report of any officer below 90 days will not be considered

  • Confirmation=probation period+1st April

  • promotion=40+8.35+52

  • Time Scale (9year-14year-19year)

 

Confidential Year Report verified by

  • Reporting officer 20%  till 30 april report should reach to reporting officer

  • Review officer     30%  till 15th may

  • Final officer          50%  till 15 july report shall be reached to UPPCL Headquarter

Term used in Annual confidential Report

  • Excellent              20/20

  • Very Good         16/20

  • Good                  12/20

  • Satisfactory        06/20

  • Unsatisfactory      0/20

 

Punishment:

  • Minor Punishment      -06  Clarification

  • Major Punishment       -12 Charge sheet


Min criteria for Promotion Above executive Level:

  • Min 10 Year ACR required

  • Seniority +Marks based on ACR(min 120(for SE)+130(for chief)+140(for director))

 


अभियंता सेवा नियमावली 1970=AE(T)(कार्मिक-07)-AE(कार्मिक-03 except R&S)-AE(कार्मिक-04 R&S)

Condition for Regularisation

  • NO ACR But work performance will be considered which will be issued through EE

Condition for Permanent

  D.P status-ACR(2year)-confirmation-seniority list

Uttar pradesh Karmchari Acharan Niyamawali-1956

Uttar pradesh Karmchari Acharan Niyamawali-1956 updated on 2002


Uttar pradesh Power corporation ltd.Karmik(Anushasan&Apeal):Download

viniyamawali 2020 by Er. AK sinha DY.Secy 7007372074

  • Disciplinary Authority can punish &check report submitted by investigating officer

  • Appointing Authority can Dismiss/Remove from charge/service

  • Investigating Authority  can only verified reason

  • Law officer can be hired by accused employee

  • Appeal should be with in 90 days in appellate committee

  • Reopen case-Revision not allowed

  • Appellate case-Revision is allowed




EE committee : Can expend 10 thousand/month during Emergency

  • Executive Eng.

  • Related SDO

  • Accountant Appointed by SE

SE Committee:Can expend 2lac/month during emergency

  • S.E (president)

  • Senior most EE (Member)

  • Accountant appointed by C.E

CE Level-2 Committee: can expend 25 Lac

  • C.E level-2 (president)

  • Senior most S.E(Member)

  • senior/Deputy Accountant officer nominated by C.E level-1

C.E Level-1 Committee: can expend 25lac-1crore

  • C.E level-1 (president)

  • Senior most C.E level-2(member)

  • Deputy chief accountant

Director Committee:can expend 1 crore to 10 crore

  • Director Transmission(President) 

  • Director P&A (member)

  • Director Finance (member)

  • Related C.E (co-ordinator)

MD Committee:can expend 10crore to 25 crore

CSPC Committee:can expend above 25 crore


  • Brief discussion on open access- download

  • Key functions of indian electricity grid code-Download

  • Electricity amendment bill-2021- Download

  • Electricity Supply code- Download

  Amendment made in income tax for financial year 2021-2022 &Annexture- Download

  • Batteries,Battery charger &DC  distribution boards And different Authorities Role for 220kv&132kv substation-Download

  • For 132 kv 110V,200AH

  • For 220Kv Substation 300AH 2 set Battery

  • For 400 kv Substation 500AH

  • Electrolyte temp<500C  specific gravity1.85  charging current=20A

  •  Administrative Approval

  • Expenditure Approval

  • Technical Approval

  • Appropriation of fund

  • RTI Act 2005-Rule download for file RTI online click here

  • Disposal of RTI request-form5 should be used for providing information& form7 should be used for rejection of information


Construction of transmission line:

  1.  Financial approval

  1. REC

  2. PFC

  3. IR

      2.NOC

  1. Railway crossing

  2. NHAI

  3. PTCC army railway BSNL

  4. River crossing

  5. PLCC




CPF:

  • 5 year service is compulsory for getting contributor money

  • 3month basic pay or 50% of cpf which are less can get money during the service period but this money shall be contributed within 12 month-36month

  • 50% of cpf contribution amount can be withdrawal

  • Tax free amount

Gratuity:

  • Min 5 year service is required

  • 15 day salary is given based on last pay or basic pay of the day of requirement

  • Max service period 33 year

  • gratuity=(last basic pay+DA)15/26year  max 20lac

Retirement Benefit:

  • CPF

  • Gratuity

  • Leave Encashment

  • TA

  • Immediate relief Advance

  • Ex grafia compensation

  • Compensate appointment 1975 condition

  • Cpf link insurance

  • Electricity bill

  • Medical reimbursement

  • LTC


Transmission Tower:

  • Suspension Type(A type tower

  • Tension(B,C,D Type tower)

Transmission SDO power

  • For Supply/Buy order: 4000Rs individual max 10 thousand/month max by quotation

  • For Execution of work:10000Rs. Individual max 20k


Transmission EE Power: max 2lac/month

  • Buy&supply: i)5000Rs material can buy through quotation

                    ii)5000-20k can buy through tender

  • Work Execution: 10k by quotation

ii)above 10k by tender notice


SDO Responsibilities:

  • Sub Division survey

  • Line survey

  • Equipment maintain

  • Battery checking

  • Log sheet

  • Work service book

  • Audit record

  • Physical verification of store in feb/march


Audit Inspection Report(AIR):

  • Part A

Important Audit-Potential Draft Para-Draft Para-Anual Audit(CAG)-Audit(Public undertaking committee)+para

  • Part B

  • Part C 


Power Regulatory term:  Download

Central Electricity Regulatory commission: Download

Procedure of Scheduling,Despatching ,Energy Accounting and settlement system of open Access-  Download

seller =Who supply power in grid

SPS   =system protection scheme

df/dt=Rate of change in frequency

UFR=under frequency relay

CTA

STOA   short term open access

URS

SCED   Security Constrained Economic Despatch

Bialateral

OD/UD     Overdrawn/ Underdrawn

Buyer=Who takes power from grid

Trader

PPA           Power Purchase Agreement

PAC-Public Accounts Committee 

PSA          Power sell Agreement
Open Access:i)short Term  till 3month

ii)Medium Term 3mont-3year

iii)Long Term above 3year

Merchant power:Without PPA & PSA

Prosumer  :consumer who buy and sell energy from grid







UPPCL History :  UPSEB dissolution in 14.01.2000









Thank You&Best Of Luck 